MetaTOC stay on top of your field, easily

Are behaviors at one alternative in concurrent schedules independent of contingencies at the other alternative?

Journal of the Experimental Analysis of Behavior

Published online on

Abstract

Some have reported changing the schedule at one alternative of a concurrent schedule changed responding at the other alternative (Catania, 1969), which seems odd because no contingencies were changed there. When concurrent schedules are programmed using two schedules, one associated with each alternative that operate continuously, changing the schedule at one alternative also changes the switch schedule at the other alternative. Thus, changes in responding at the constant alternative could be due to the change in the switch schedule. To assess this possibility, six rats were exposed to a series of conditions that alternated between pairs of interval schedules at both alternatives and a pair of interval schedules at one, constant, alternative and a pair of extinction schedules at the other alternative. Comparing run lengths, visit durations and response rates at the constant alternative in the alternating conditions did not show consistent increases and decreases when a strict criterion for changes was used. Using a less stringent definition (any change in mean values) showed changes. The stay/switch analysis suggests it may be inaccurate to apply behavioral contrast to procedures that change from concurrent variable‐interval variable‐interval schedules to concurrent variable‐interval extinction schedules because the contingencies in neither alternative are constant.