Cost efficient electrification: Enhanced construction assurance using high-resolution as-fitted static wire profiles to identify allocation and construction errors
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Published online on December 22, 2025
Abstract
Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, Ahead of Print.
A novel construction assurance methodology was developed and tested on the Overhead Line Equipment (OLE) as part of the Midland Mainline Electrification (MMLE) Kettering to Wigston (K2W) project in the UK. Implemented alongside the National Technical ...
A novel construction assurance methodology was developed and tested on the Overhead Line Equipment (OLE) as part of the Midland Mainline Electrification (MMLE) Kettering to Wigston (K2W) project in the UK. Implemented alongside the National Technical ...