MetaTOC stay on top of your field, easily

Optimum mission termination policy for a k-out-of-n: F system including subsystems assembled with protective devices

, , ,

Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability

Published online on

Abstract

Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, Ahead of Print.
Industrial systems with protective devices (PDs) perform essential tasks but face significant failure risks. Under certain conditions, missions should be aborted to initiate rescue processes, balancing the system survivability and the task success ...